Project summary:

A major refined products pipeline company discovered severe corrosion on a section of transfer pipe at one of their terminal facilities. The corrosion was primarily located at the ground-to-air interface where the pipe comes out of the ground. The pipe was repaired with four layers of high-strength carbon fiber to provide structural reinforcement, as well as a corrosion barrier.

  • Date of installation: 07/22
  • End user: Colonial Pipe
  • Facility/Location: Northeastern US
  • Applicator: RPT New York
  • Products used:
  • CF-500 BD
  • FRP 200 Saturant