Composite Pipe Repair

Industry: Chemical

Solution: Chemical Waste Pipes

ID: CPR-8-00111

Project summary:

A chemical company noticed that a forty-two inch diameter section of wastewater pipe was experiencing corrosion and erosion while in service. Several through-wall failures had been observed in other sections of the pipe as well. The pipe was rebuilt internally, using a high-strength carbon fiber reinforcement system, then top-coated with a ceramic reinforced epoxy.

  • Date of installation: 07/22
  • End user: Momentive
  • Facility/Location: New York
  • Applicator: CTI
  • Products used:
  • CF-500 BD
  • FRP 211 Saturant
  • HP 300 Epoxy
  • Ceramic Repair Putty