Composite Pipe Repair

Industry: Oil & Gas

Solution: General Pipe Repairs - External Pipe

ID: CPR-6-00112

Project summary:

An underground section of a major energy pipeline was found to have external corrosion during a smart PIG inspection. The section was excavated, the existing coating was removed, and an 8-foot section was reinforced with a chemically-resistant, high-strength carbon fiber reinforcement system.

  • Date of installation: 04/22
  • End user: Colonial Pipe
  • Facility/Location: Northeastern US
  • Applicator: RPT New York
  • Products used:
  • CF-500 BD
  • FRP 200 Saturant

BACK