Raw sewage intake pipe coming through concrete wall.

Composite Pipe Repair

Industry: Water & Wastewater

Solution: Raw Sewage Piping

ID: CPR-7-00123

Project summary:

The inspectors at a wastewater treatment plant found a leak in one of their raw sewage intake pipes. The repair was more difficult as the leak was located adjacent to where the pipe went through a concrete wall. Advanced FRP Systems provided a 4-layer carbon fiber based repair system. It was installed externally around the circumference of the pipe and will provide a long-term solution, despite continued internal corrosion.

  • Date of installation: 3/21
  • Facility/Location: New York
  • Applicator: RPT New York
  • Products used:
  • FRP 200 Saturant
  • CF-500 BD

BACK