Composite Pipe Repair Process Water and Fire Water

Composite Pipe Repair

Industry: Chemical

Solution: Process Water and Fire Water

ID: CPR-8-00017

Project summary:

A chemical manufacturer was experiencing joint failures on their cooling tower feeder pipes. The joints were repaired while the pipe was online with a high-strength carbon fiber composite.

  • Date of installation: 10/1/2016
  • End user: Chemical Manufacturer
  • Facility/Location: Red Deer, Alberta
  • Applicator: ProPaint Canada
  • Products used:
  • CF-500 BD
  • FRP Putty 100
  • HP-300 Epoxy