Project Details
A critical cooling pipe was repeatedly failing at a sugar processing facility. In the past, a large clamp repair was used; however, due to pervasive wall thinning and loss, the clamp could not provide a long-term solution, which led to repeat failure and further damage to the pipe. A structurally independent, carbon fiber reinforcement system repair was applied to the external surface of the pipe, providing a long-term, maintenance-free solution.