Composite Pipe Repair
Industry: Oil & Gas
Solution: Refined Product Piping
ID: CPR-6-00121
Project summary:
A standard smart pigging corrosion assessment found areas that required mitigation on a pipeline buried 10 feet below grade. The operator wanted a long-term maintenance-free solution that was reliable enough to prevent any of the flammable material within from leaking into the environment. Advanced FRP Systems developed a 4-layered carbon fiber reinforcement system that would eliminate corrosion and provide structural reinforcement to this critical asset.
- Date of installation: 8/19
- Facility/Location: New York
- Applicator: RPT New York
- Products used:
- FRP 200 Saturant
- CF-500 BD