Composite Pipe Repair
Industry: Water & Wastewater
Solution: Raw Sewage Piping
ID: CPR-7-00151
Project summary:
Inspectors at a water and wastewater facility found corrosion at the spigot joints and elbows of two pipes in a circulating water line. The solution provided started by first blasting the steel surface and then applying a hold coat. Putty was then used to smooth the surface, transition the joints, and to fill in the pits. A composite system was then applied to complete the pipe reinforcement using a galvanic barrier and 4 layers of carbon fiber.
- Date of installation: 06/23
- Facility/Location: Ravena, NY Water Department
- Applicator: CTI
- Products used:
- FRP Repair Putty
- FRP 120 HT Adhesive
- FRP 210 HT Saturant
- GF-300 BD
- CF-500 BD