Project Details

A loading ramp designed to support heavy-weight vehicle traffic at a manufacturing facility had cracks and concrete damage that had to be rebuilt.

Advanced FRP Systems designed a crack-bridging and concrete reinforcement system that combined an elastomeric epoxy to fill cracks and expansion joints, a high-strength carbon fiber composite to reinforce the concrete, and a UV-stable topcoat. The repair was conducted in less than 48 hours to minimize the impact on deliveries.

Having Issues with Tank Corrosion or Erosion?

Contact us for a free evaluation!

X