
Coatings
Industry: Oil & Gas
Solution: Fracking Chemical Storage and Transportation
ID: CTS-6-00060
Project summary:
A fracking fluid fill station was being built in a remote area in Texas. In order to ensure the concrete in the tank farm and fill area did not suffer damage from any potential acidic fluid spills, a secondary containment system was installed that included non-skid areas for pedestrian walkways.
- Date of installation: 3/1/2020
- End user: Energy Services Company
- Facility/Location: Texas
- Applicator: Cameron Industries
- Products used:
- FRP Saturant 200
- HP-410 GF