
Composite Tank Repair
Industry: Oil & Gas
Solution: Water Treatment Tanks
ID: CTR-6-00066
Project summary:
A bolted, oily water storage tank at a midstream water management company was leaking. The tank was taken out of service for repair. Corroded bolts were encapsulated, holes were patched with carbon fiber composite patches, and the entire tank was coated with an immersion-grade epoxy coating.
- Date of installation: 3/1/2020
- End user: Midstream Water Management Company
- Facility/Location: Texas
- Applicator: Cameron Industries
- Products used:
- CF-500 BD
- FRP 210 HT
- FRP 230-PC
- HP-410 GF