Composite Tank Repair
Industry: Pulp & Paper
Solution: Chemical Storage Tanks
ID: CTR-9-00097
Project summary:
During a planned outage, a pulp and paper plant found severe degradation to the weld seams in a critical chemical storage tank. The 23 ft. long cylindrical tank operated at elevated temperatures and contained a highly volatile and flammable liquid, turpentine. After spot welds were performed on the severely damaged weld seams, a full composite reinforcement was performed on the tank.
- Date of installation: 6/21
- End user: Georgia Pacific
- Facility/Location: Cedar Springs
- Applicator: Coast 2 Coast Coatings
- Products used:
- FRP Repair Putty
- FRP 211 HT Saturant
- CF-500 BD
- HP 400 Novo