Composite Pipe Repair

Industry: Power Generation - Fossil Fuel

Solution: Circulating Water Lines

ID: CPR-1-00078

Project summary:

UT thickness testing found various areas within a circulating water line that were suffering from extensive internal corrosion. The plant used a flange-to-flange carbon fiber repair method to ensure a long term solution

  • Date of installation: 5/1/2015
  • End user: Power Generation Facility
  • Facility/Location: Bridgeport, CT
  • Applicator: A&G Industrial
  • Products used:
  • CF-500 BD
  • FRP 200
  • HP-300 Epoxy